
New TopShim run:

version = topshim 2.3.0
date = 2023-08-18
time = 20:27:53.491
command = topshim 

FINE SHIMMING

Parameters:

probe = Z130030_0001
solvent = CDCl3
shim nucleus = 2H
nucleus optimised for = 1H
o1p (from lock) = 7.24 ppm

Results:


1D Shimming:
echo time must be reduced
Iteration 1: FWHM Before= 2.7 Hz, Target= 0.5 Hz, After= 0.9 Hz
Iteration 2: FWHM Before= 0.9 Hz, Target= 0.7 Hz, After= 0.7 Hz
Iteration 3: FWHM Before= 0.7 Hz, Target= 0.5 Hz, After= 0.7 Hz
Iteration 4: FWHM Before= 0.7 Hz, Target= 0.5 Hz, After= 0.8 Hz
Iteration 5: FWHM Before= 0.8 Hz, Target= 0.6 Hz, After= 0.6 Hz
Shim succeeded

Lineshape quality factor (1D spectrum, spinning) = 0.697

shim changes: 
Z	+56
Z2	-9
Z3	+101
Z4	+62
Z5	+28

duration = 1 min 37 sec
completed successfully
finished Fri Aug 18 20:29:30 2023


========================================================================
